In brief: architects in Chester typically charge a percentage of the construction cost, a fixed fee per stage, or an hourly rate. The total depends on how many RIBA stages you appoint them for, the complexity of planning and the size of the build. Always compare written proposals covering the same scope, and add VAT and other consultants' fees to your budget.
There is no official fee scale for architects in the UK. The RIBA stopped publishing recommended fee scales many years ago, and fee levels are a matter for negotiation between you and the practice. That means two quotes that look very different can each be fair, because they cover different work. The key is to understand exactly what you are buying.
The three common fee models
| Model | How it works | Best for | Watch out for |
|---|---|---|---|
| Percentage | A percentage of the final construction cost, usually invoiced stage by stage | Larger projects where the cost will become clearer as design develops | The fee rises if the build cost rises; agree how the cost is defined |
| Fixed (lump sum) | An agreed price for defined stages and deliverables | Extensions and lofts with a clear brief | What counts as a “change” and how extra work is charged |
| Hourly or daily | Time charged at an agreed rate | Feasibility studies, advice, small or uncertain tasks | Ask for an estimate and a cap, with regular time reports |
What each RIBA stage covers
Most architects structure their appointment around the RIBA Plan of Work 2020, which divides a project into eight stages. Knowing them makes quotes far easier to compare.
- Stage 0 – Strategic definition. Is the project worth doing? Often a short initial meeting.
- Stage 1 – Preparation and briefing. Your brief, budget, surveys and site constraints such as conservation area or listed status.
- Stage 2 – Concept design. Sketch options and an early cost check.
- Stage 3 – Spatial coordination. Developed design coordinated with the engineer, usually the stage at which a planning application is submitted.
- Stage 4 – Technical design. Building Regulations drawings, specification and tender information.
- Stage 5 – Manufacturing and construction. Contract administration and site inspections if appointed.
- Stage 6 – Handover. Snagging, completion certificates and final account.
- Stage 7 – Use. Post-occupancy feedback; rarely charged on homes.
A “planning only” quote usually covers Stages 1 to 3. A “full service” quote covers Stages 1 to 6. When one architect seems much cheaper, check which stages are missing.
Plan your budget with your own figures
Other costs to budget for in Chester
- Planning application fee. Set nationally and now increased each April; check the current figure on the Planning Portal. Listed building consent applications currently carry no fee.
- Building Regulations charges. Charged by the council's building control service or a registered building control approver.
- Structural engineer. Needed for almost any extension, loft or opening up of walls.
- Measured survey. Some architects include it, others subcontract it.
- Party wall surveyor. Where a neighbour does not consent to notified works.
- Heritage and environmental reports. Heritage statements, tree surveys, bat surveys, flood risk assessments and, inside Chester's Area of Archaeological Importance, possible archaeological monitoring.
- VAT on the build. Most building work is standard-rated. There are limited exceptions, for example for some conversions; ask an accountant before assuming.
How to compare architect quotes
- Send every practice the same written brief and budget.
- Ask each to list the RIBA stages, number of design options, meetings and site visits included.
- Check what is excluded: surveys, engineer, heritage statement, planning fees, expenses.
- Ask how changes and extra work are charged, and the rate.
- Confirm professional indemnity insurance and ARB registration, and ask for a written appointment such as the RIBA Domestic Professional Services Contract.
Next, read the Chester planning permission guide to see which approvals your project is likely to need, or our guide to house extension architects in Chester.
Frequently asked questions
How do architects in Chester charge?
Most use one of three models: a percentage of the construction cost, a fixed fee (often split by RIBA stage) or an hourly or daily rate. Many combine them, for example a fixed fee up to planning and a percentage for later stages. Ask for the fee in writing with the stages, deliverables and expenses clearly listed.
Is it cheaper to appoint an architect only for planning drawings?
The upfront fee is lower, but you then need Building Regulations drawings and a specification from someone, and builders' quotes based on thin information tend to be less reliable. For simple extensions a planning-only appointment can work; for complex or heritage projects a fuller appointment usually saves money overall.
Do architect fees include VAT?
Not usually. VAT-registered practices add VAT at 20 percent to their fees, so check whether a quote is shown with or without VAT. Smaller practices below the VAT threshold may not charge it.
What other professional fees should I budget for?
Common extras include a measured survey, a structural engineer, planning application and Building Regulations fees, a party wall surveyor, and on some sites a heritage statement, arboricultural report, bat survey, flood risk assessment or archaeological work. Listed buildings and properties in Chester's historic core are more likely to need specialist reports.